Temporary Power Poles in Simi Valley
Site power, set up properly. Without the back-and-forth.
50A sub poles and 100, 200 or 400A meter poles, overhead or underground. Installed by our crew, connected by SCE.
✓ Takes less than 60 seconds · No obligation · In a hurry? Call (818) 960-1941
Dispatch in 1–3 daysTrusted by teams across California
What customers say
“Super efficient with booking and clear upfront communication”
Poles
Pole options for Simi Valley sites
50A Sub Pole
A smaller pole fed from an existing supply. Good for tools and lighting.
100A Meter Pole
Its own meter, connected by SCE. For smaller builds and remodels.
200A Meter Pole
The size most residential builds need.
400A Meter Pole
For larger builds and heavier loads.
Amp = how much power the pole can supply. Not sure which you need? Pick 'not sure' in the quote form and we'll help.
Overhead poles take power from a nearby utility line. Underground poles connect to a buried supply. Your site decides which.
Get My Free Power Pole Quote →Who does what
Your part, our part, SCE's part
| Step | Who |
|---|---|
| Call DigAlert 811 so buried lines get marked (free) | You or your electrician |
| Supply and install the pole | All Site Rentals |
| Pull the electrical permit from City of Simi Valley | You or your electrician |
| Book the inspection | You or your electrician |
| Connect and energize the pole | SCE |
From permit to power-on usually takes 3–6 weeks. Most of that is the inspection and the SCE connection. Book the pole early.
Pricing
What a temporary power pole costs in Simi Valley
Setup typically runs $1,000–2,500, then $95–200 a month. Permit, inspection and SCE fees are paid by you, separately.

Local knowledge
Temporary power in Simi Valley: what to know
Permits in Simi Valley go through City of Simi Valley. Power is supplied by SCE. Your electrician will know both; we install to suit.

Frequently asked
Power pole questions from Simi Valley
Need an answer specific to your site? Call (818) 960-1941.

Who pulls the permit for a temporary power pole in Simi Valley?
You or your electrician. The permit comes from City of Simi Valley. We supply and install the pole. Your electrician books the inspection and arranges the SCE hookup.
How long until the pole has power?
Usually 3–6 weeks from permit to power-on. The inspection and the SCE connection take most of that time. Book early.
Do I need to call DigAlert before you install?
Yes. You or your electrician call DigAlert 811 before installation. It's free, and it marks buried lines so the pole goes in safely.
How much does a temporary power pole cost in Simi Valley?
Setup typically runs $1,000–2,500, plus $95–200 a month. Permit, inspection and SCE fees are separate and paid by you.
What's the difference between overhead and underground?
Overhead poles take power from a nearby utility line. Underground poles connect to a buried supply. Your site and SCE decide which you need.
Nearby areas
Temporary power poles near Simi Valley
Also in Simi Valley: porta potty rental · temporary fencing
Ready when you are











