Temporary Power Pole
A temporary power pole gives your site metered power until the permanent service is in. A sub pole runs off existing power. A meter pole gets its own service from LADWP or SCE. We supply the pole and install it. You keep building.
Overhead poles take power from a nearby utility line. Underground poles connect to a buried supply. Your site decides which.

The details
| Spec | Temporary Power Pole |
|---|---|
| 50A Sub Pole | A smaller pole fed from an existing supply. Good for tools and lighting. |
| 100A Meter Pole | Its own meter, connected by LADWP or SCE. For smaller builds and remodels. |
| 200A Meter Pole | The size most residential builds need. |
| 400A Meter Pole | For larger builds and heavier loads. |
| Service | Overhead or underground |
| On the pole | GFCI outlets and weatherproof boxes |
Included
Add if you need them
Where it fits
The size most residential builds need is a 200A meter pole.
A 50A sub pole runs from an existing supply.
400A meter poles for larger builds and heavier loads.
Power takes the longest to arrange, so start early.
Learn more →Side by side
| Sub Pole | Meter Pole | |
|---|---|---|
| Amps | 50A | 100, 200 or 400A |
| What it does | Feeds off existing power on site | Its own metered service |
| Typical use | Small remodels, extra outlets— | Most residential builds— |
Reviews
“Very professional and fast service.”
“Super efficient with booking and clear upfront communication”
Temporary Power Pole
Need an answer specific to your site? Call (818) 960-1941.

Most residential builds need a 200A meter pole. Smaller jobs may need 100A; larger builds 400A. A 50A sub pole runs from an existing supply. Not sure? Ask in the quote form.
Yes. You or your electrician call DigAlert 811 before installation. It's free, and it marks buried lines so the pole goes in safely.
You or your electrician. We supply and install the pole. Your electrician books the inspection and arranges the LADWP or SCE hookup.
Usually 3–6 weeks from permit to power-on. The inspection and the utility connection take most of that time. Book early.
Yes. Add them in the same quote form. One contact, one quote, one crew.